Work Background

The Abha Substation project was a key milestone in strengthening the southern region’s power infrastructure. EECC was entrusted as a civil works subcontractor by Al Ojaimi Holding, contributing to the successful delivery of the 380/110/13.8kV Bulk Supply Point (Lot 3).


Our role focused on translating complex engineering plans into on-ground execution with precision and safety. From site preparation and excavation to foundation construction, cable trenches, and road networks, EECC ensured every phase adhered to the highest industry standards and SEC specifications.


The challenge lay in coordinating multiple workstreams across a technically demanding site — balancing schedule efficiency, structural integrity, and environmental considerations. Through disciplined project management and a dedicated on-site team, EECC delivered results that reflected our core values: commitment, quality, and reliability.