INSTALLATION OF REACTORS AT MKW & SISED BSP'S
Executed comprehensive civil and structural assessments, optimized site-specific design strategies, and developed an integrated construction framework emphasizing precision, adaptability, and environmental efficiency.
Aug 22, 2025
CLIENT
SEC
ROLE
Sub Contractor-Al Ojaimi Holding
SERVICE
Installation
Work Background
The MKW and SISED Substation Reactor Installation project was envisioned to enhance grid stability and optimize energy distribution efficiency across the Madina region.
Our goal was to integrate new reactor systems seamlessly within the existing substation infrastructure while maintaining operational continuity and structural integrity.
EECC worked as a civil works subcontractor for Al Ojaimi Holding, engaging from the early stages of planning through to execution. The team carried out detailed site evaluations, precision foundation works, and cable routing, while ensuring adherence to SEC standards and safety protocols.
The challenge lay in executing high-precision construction within live substations — requiring synchronization between civil, electrical, and safety teams. EECC’s disciplined project management and commitment to quality delivered a smooth, efficient, and resilient installation that strengthened the region’s power network.