AL JOUF OHTL PILING WORK PROJECT
Executed comprehensive geotechnical assessments and optimized piling strategies to support the Overhead Transmission Line corridor with structural precision. Streamlined site operations to ensure accurate pile positioning, alignment, and depth control while adhering to SEC standards and rigorous safety protocols.
Nov 19, 2025
CLIENT
SEC
STATUS
Ongoing
SERVICE
OHTL Foundations & Piling Works
Work Background
The Al Jouf OHTL Piling Works project marks an important contribution to reinforcing the Kingdom’s power transmission network.
Our scope focuses on transforming detailed engineering designs into accurate on-ground execution. This includes carrying out geotechnical preparations, pile positioning, and controlled drilling operations to establish reliable foundations for the transmission towers. Each activity is being delivered in strict alignment with SEC standards, safety requirements, and quality benchmarks.
The project presents a complex environment, requiring the coordination of multiple teams across a wide geographical stretch, while managing soil variability, logistical constraints, and tight schedule expectations. Through proactive planning, careful execution, and a dedicated field team, EECC is steadily progressing toward delivering a durable and resilient piling framework—reflecting our commitment to operational excellence and long-term infrastructure reliability.